SUPERMICRON Pilot Sites

The SUPERMICRON system is currently being tested at length in survey activities in a few pilot sites. One of these is a tyre manufacturing plant in the North West, a penstock unit and an Alpine tunnel.

TYRE PLANT

Pilot installation
Pilot installation (May 2016) in a historic tyre plant based
in Northern Italy, completely renovated in 2012.

HYDROELECTRIC POWER PLANT

Pilot installation
Pilot installation (June 2016) in a hydroelectric power plant in the Aosta Valley, Italy. The unit is currently being completely renovated.

ALPINE ROAD TUNNEL

System installation in progress
Pilot system to be installed in the last quarter of 2018 for the survey of the structural reinforcement of an Alpine road tunnel.

ALPINE TUNNEL

System installation in progress
Pilot system to be installed in the last quarter of 2018 in the geognostic survey burrow for an Alpine tunnel.